Home About Us Projects Contact Us
MCPOWER Europe GmbH — Cologne & Berlin

Engineer-led infrastructure delivery in Germany.

We build fiber optic networks, execute civil works and install electrical grid infrastructure for Germany's leading telecom operators and utility networks — controlled by registered engineers from mobilization through to Abnahme.

93km
FTTH Deployed
~1,500
Home Connections
3
Federal States
25
Delivery Team
Project Environments & Partners
Deutsche Telekom Geodesia Deutschland GmbH Westnetz GmbH Circet Germany Constructel GmbH Vitronet
Who We Are

Three years from start-up to operational German contractor.

Founded in January 2022 in Cologne, MCPOWER Europe GmbH has grown into a 25-person engineering organisation delivering end-to-end fiber optic, civil works and grid infrastructure across Germany.

What sets us apart is straightforward: every project is run by registered engineers who carry technical and regulatory responsibility from day one — not subcontracted away, not delegated. When you appoint MCPOWER, you get direct engineer accountability through to the acceptance protocol.

Completed and signed-off projects are supported by documented regulatory handover records and associated protocols, available on request where appropriate.

2022 Founded in Cologne HRB 109418 · Amtsgericht Cologne
25 Team Members 5 engineers · 17 field staff · 3 admin
284 Creditreform Index PD 1.74% · Well below German average
+88% Revenue Growth €2.08M in FY 2025 vs 2024
Core Competencies

End-to-end capability across fiber, civil and grid.

Three integrated practice areas operated by one engineering management team. The same registered engineer signs off on civil, fiber and electrical acceptance — eliminating interface risk across the entire project lifecycle.

01
Fiber Optic Infrastructure

FTTH, FTTX and FTTB design, deployment, splicing and acceptance documentation. From POP installation to OTDR-verified home connection.

FTTH / FTTX / FTTB GPON Cable Blowing Splicing OTDR
02
Civil Works (Tiefbau)

Open trench, horizontal directional drilling (HDD) and full surface reinstatement on public roads — asphalt, concrete and cobblestone — with complete traffic management.

Open Trench HDD GPR Survey Reinstatement Traffic Mgmt
03
Electrical & Grid Works

Underground LV/MV cable installation, substation works, cable jointing and earthing — under HWK Berlin certification. Full coordination with Netzbetreiber.

LV / MV Cable Substations Cable Jointing HWK Berlin
Reference Projects

Selected work · 2022 — 2026

Four projects across three federal states. All executed as sole subcontractor or approved supplier — with full engineering responsibility and documented acceptance protocols.

Baden-Württemberg
Completed · Documented handover

FTTH Deployment — Bönnigheim Altstadt

Deutsche Telekom via Constructel GmbH  ·  2022–2023

Full FTTH deployment through a historic Altstadt district — combining asphalt road works with precision cobblestone reinstatement. Traffic management coordinated with the municipality throughout. Independent end-to-end execution as sole subcontractor.

14 km FTTH Network
600 Home Connections
Brandenburg
Completed · Municipal certification obtained

FTTH Expansion — Mühlenbecker Land & Hohen Neuendorf

Deutsche Telekom via Circet Germany  ·  2023–2024

Fiber optic expansion in rural and suburban zones north of Berlin. Ten kilometers required hand excavation in environmentally sensitive wooded areas — executed in coordination with local environmental authorities under full DIN compliance.

30 km FTTH Network
10 km Hand Excavation
NRW
Completed · Registered in municipal records

FTTH Civil Works — Westconnect Programme

Westnetz GmbH via Vitronet  ·  2024  ·  Steinheim · Lügde · Dortmund

Civil works and surface reinstatement across three urban NRW locations as a Westnetz-approved supplier. Each site demanded active traffic management and strict NRW road authority compliance in restricted urban working space.

3 Urban Sites
NRW Approved Supplier
NRW
In Delivery · Documentation maintained by section

City-Wide FTTH Programme — Krefeld

OXG programme via Geodesia Deutschland GmbH  ·  2025–2026

City-wide FTTH rollout delivered through Geodesia Deutschland GmbH within the OXG programme. PDP sections, OTDR test protocols and as-built documentation are maintained by section throughout delivery.

35 km Civil Works
900 Home Connections

Project documentation is available under NDA where appropriate. As-built drawings, OTDR protocols, handover records and photo logs are available for completed and signed-off projects.

Submit a Pre-Qualification Request
Delivery Model

Predictable execution from mobilization to Abnahme.

A five-phase delivery model applied uniformly across every project since 2022. Documentation is treated as a primary deliverable — not a closing exercise. As-built drawings, OTDR protocols and compliance logs are compiled in real time, so acceptance preparation is never a back-end bottleneck.

01
Mobilization

Site assessment, resource planning and regulatory alignment with municipality, utility and traffic authorities.

02
Execution

Engineer-supervised fieldwork with defined quality checkpoints at each section closure.

03
Monitoring

KPI-driven progress tracking, cost control and early risk detection across all crews.

04
Documentation

Continuous as-built records, OTDR test protocols and compliance logs maintained in real time.

05
Abnahme

Structured acceptance preparation — zero open items at handover to the client.

Single point of accountability

All three practice areas — fiber, civil and electrical — operate under one engineering management. The same registered engineer signs off on every acceptance protocol, eliminating the interface risk that comes with fragmented subcontractor packages.

PMI-aligned project management

Projects are managed against PMI-style performance indicators: scope fulfilment, schedule adherence, cost discipline and quality compliance. Internal reviews held weekly; client-facing progress reports issued in agreed cadence.

Owned equipment fleet

A fully owned plant fleet — excavators, HDD machines, fiber splicers, OTDR equipment — eliminates rental dependencies, removes scheduling risk and ensures MCPOWER can mobilize on short notice without third-party constraints.

Why MCPOWER Europe

Nine reasons clients choose engineer-led delivery.

Controlled, accountable and documented delivery from mobilization onward. The differentiators below reflect the operating standards applied across our work.

TRACK RECORD
Documented Acceptance Record

Completed and signed-off projects are supported by maintained handover records, acceptance protocols and project evidence.

ACCOUNTABILITY
Engineer-Led Execution

Registered civil and electrical engineers retain technical responsibility from mobilization through Abnahme and coordinate the relevant delivery disciplines.

DELIVERY
Controlled Five-Phase Model

Mobilization → Execution → Monitoring → Documentation → Abnahme. Applied uniformly since 2022. Active subcontractor coordination at every stage.

MANAGEMENT
KPI-Driven Performance

PMI-aligned tracking across scope, schedule, cost and quality. Weekly internal reviews. Client-facing progress reports on agreed cadence.

EQUIPMENT
Full Equipment Independence

Owned machinery for civil, reinstatement and fiber works. No dependency on third-party plant, no scheduling risk between crews and equipment.

FINANCE
Creditreform 284 · Low Risk

Credit Index 284 with 1.74% probability of default — well below the German average. Payment discipline within agreed terms, consistently.

CAPACITY
Scalable, Structured Team

25 professionals across Cologne and Berlin. Engineering registrations covering NRW and Berlin. Capacity scales without quality loss.

EXPERTISE
Operator-Side Telecom Background

15+ years of telecom infrastructure delivery across Türkiye and Germany, with international operator-side experience — at operator, supplier and contractor levels.

RISK
Early Risk Detection

Permit dependencies, scope ambiguities and resource constraints are identified early and managed through structured mitigation planning.

Management Team

Engineers with operator-side telecom experience.

MCPOWER Europe is led by engineers with telecom infrastructure delivery experience across operator, supplier and contractor environments in Türkiye, Germany and Qatar. That perspective shapes every project decision.

MC
Managing Director

Metin Cerrah

M.Sc. Civil Engineering, Yıldız Technical University. Registered Civil Engineer with IK-Bau NRW since 2024. Founder and CEO of MCPOWER Global. Over 15 years of project management experience spanning fiber optic infrastructure, telecom and solar energy for Turkcell, Huawei and MEDAŞ. Delivered 65,000 FTTX connections and a 3 MW solar EPC project in Türkiye before establishing the European operation.

IK-Bau NRW M.Sc. Civil Eng. PMBOK
MT
Project Director

Murat Targıtay

Electrical-Electronics Engineer, registered with IK-Bau NRW. Operations Manager for Electrical Technicians under HWK Berlin certification. Ten years of hands-on experience in telecom and electrical infrastructure with Turkcell, Huawei and Aydem. Field-level expertise in MV/LV cable installation, substation works and grid connection — coordinates German electrical certification compliance across all MCPOWER projects.

IK-Bau NRW HWK Berlin Electrical Eng.
MY
Project Manager

Mustafa Yüceer

B.Sc. Electrical-Electronics & Computer Engineering (double major), Anadolu University. PMP-certified with PM Cube modules in Finance, Supply, Governance and Leadership. Twenty years of project management experience at Ericsson, Vodafone and Turkcell — including Customer Project Manager for Ooredoo Qatar and CRA Qatar at Ericsson, and FTTH Project Manager at Vodafone Istanbul.

PMP Certified Ericsson Vodafone
Certifications & Registrations
Ingenieurkammer-Bau NRW
HWK Berlin · No. 146357
Creditreform Index 284
BG ETEM · No. 14066582
IHK Köln Member
§48b EStG Freistellung
HRB 109418 · Amtsgericht Cologne
Responsible Delivery

Safety, environmental care and traceable delivery.

MCPOWER integrates site safety, environmental coordination and disciplined documentation into day-to-day delivery. Work methods, reinstatement activities and project records are planned around the applicable approvals, local conditions and client requirements.

SafetyRegistered engineering oversight and BG ETEM membership support structured work planning and site coordination.
Environmental careMethods are adapted to site constraints and coordinated requirements, including sensitive or built-up environments.
TraceabilityAs-built records, test protocols and handover documentation are maintained as part of controlled delivery.
Contact

Direct contact for project enquiries.

Detailed project documentation, photo logs, OTDR test protocols, as-built drawings and acceptance certificates are available on request under NDA. Reference calls can be facilitated upon mutual agreement.

Managing Director Metin Cerrah, M.Sc. Eng.
Direct Email info@mcpowerglobal.com
General Enquiries info@mcpowerglobal.com
Headquarters · Cologne Bistritzer Straße 120 · 50858 Cologne
+49 221 69 96 07 00
Branch · Berlin Oberlandstraße 26-35 · 12099 Berlin
+49 305 85 82 90 10
Documentation Request

Project as-built drawings, OTDR protocols, acceptance certificates and photo logs available under NDA. Address requests to the Managing Director directly.

Site Visit

Active projects may be visited by appointment after mutual coordination and project-level approval.

Reference Calls

Reference documentation for completed and signed-off projects can be reviewed on request, subject to the applicable approvals and NDA requirements.

Send an Enquiry